A member of Refuel International Grouprefuelin.com

Fleet Electrification · Fleet Velocity

Which units should we electrify first?

Electric is a capability across our range, not a separate product line. Fleet Velocity modeling starts with the work your fleet does, then helps you plan a practical, phased transition.

Fleet of hydrant fueling equipment
Refuel International Group equipment example.

Fleet Velocity

The proposed assessment process

  1. 01

    Understand the operation

    Map fuel volume, aircraft mix, duty cycles and shifts.

  2. 02

    Model scenarios

    Compare utilization, coverage and charging windows.

  3. 03

    Compare options

    Weigh new-build, repower and conventional equipment.

  4. 04

    Plan a phased transition

    Agree pilot scope and replacement priorities.

Scope is confirmed with you before any assessment starts.

What we look at

  • Fuel volume and uplift patterns
  • Aircraft mix
  • Duty cycles and shifts
  • Travel distances
  • Charging windows
  • Site constraints
  • Reserve or spare capacity
  • Deployment timing

What we discuss with you

  • Utilization and coverage scenarios
  • Charging implications
  • New-build versus repower candidates
  • Pilot scope
  • Phased replacement priorities

Every scenario states its assumptions. We don't promise savings, fleet reductions or a return without a validated model for your operation.

Three equipment paths

Configuration inquiry

New electric refuelers

Electric chassis pathways for refueler configurations.

View equipment
In development

Electric hydrant equipment

GATERUNNER F6 and eligible F4 electric pathways.

View equipment
Eligibility confirmed per unit

RampStar Reset repowers

Repowering eligible existing units, assessed unit by unit.

Ask about eligibility

Commissioning, training and service

Integration, commissioning, operator training and parts support are planned with the equipment, so your team knows who to call from day one.

See AutoPilotX controls

Discuss your fleet.

Tell us about your fleet, duty and timing.

Call project sales Parts